Published by:


10R Runway Overlay

Runway centerline lights will be upgraded with LED fixtures to improve efficiency and longevity.A new Taxiway F2 will provide a secondary taxiway for departures on Runway 28L which will improve operational efficiency.Realignment of Taxiway S will improve the current geometry and enable aircraft entering Runway 10R to utilize the full length of the runway.The rehabilitation of this runway is equivalent to paving four-lanes of Interstate 101 from Millbrae Avenue to Redwood Shores.Construction will be completed by Golden Gate Constructors.

10R Runway Overlay
QR Code
Embed the QR code on your website:
Download
Copy